Chalice Gold Project

The Chalice Gold Project is Corazon’s flagship asset. Acquired from Westgold Resources Limited (ASX:WGX) and completed in July 2026, Chalice is a proven high-grade gold system on a granted Mining Lease in the Higginsville district of the Norseman-Kalgoorlie greenstone belt, approximately 50km north-west of Norseman.

The project hosts a JORC 2012 Mineral Resource Estimate of 191,000oz at 2.7 g/t Au across four mineralised zones, and has produced approximately 645,000oz at an average grade of 5.4 g/t Au. In September 2026 Corazon defined a maiden Exploration Target for the project of 9.7 to 12.3 million tonnes at 1.9 to 2.1 g/t Au, for 600,000 to 830,000 ounces of contained gold, inclusive of the existing Mineral Resource.

The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource for the additional mineralisation, and it is uncertain whether further exploration will result in the estimation of a Mineral Resource.

The Exploration Target draws on approximately 370 historical drill holes, extensive underground face and sludge sampling, three-dimensional geological interpretation and preliminary exploration modelling. Corazon interprets the mineralised system to extend approximately 1.7km along strike and 700m vertically.

Map showing the location of the Chalice Gold Project near Norseman, Western Australia, relative to Kambalda, Higginsville and nearby mills
Statement of Mineral Resources by Deposit as at 11 April 2026 with 1.3 g/t Au cut off
ClassificationTonnes (kt)Grade (g/t Au)Contained (koz Au)
Measured4063.1942
Indicated11202.694
Inferred6552.6455
Total Resources2,1812.74191
Notes:
  1. Mineral Resources are classified and reported in accordance with the 2012 JORC Code as at 11 April 2026 at a 1.3g/t Au cut-off and US$1,700/oz gold price.
  2. Numbers may not add up due to rounding.
  3. Refer to the Company’s ASX Announcement “Chalice Acquisition Establishes Corazon as an Emerging Gold Developer” dated 19 May 2026 for full disclosure, including Annexure A, B and C.

191,000oz JORC Resource

A JORC 2012 Mineral Resource Estimate of 191,000oz at 2.7 g/t Au, comprising 42,000oz Measured, 94,000oz Indicated and 55,000oz Inferred, across four mineralised zones that remain open in multiple directions.

600,000 – 830,000oz Exploration Target

A maiden Exploration Target of 9.7 to 12.3Mt at 1.9 to 2.1 g/t Au, inclusive of the existing Mineral Resource, defined over a system interpreted to extend 1.7km along strike and 700m vertically.

Open Pit Potential

The existing Mineral Resource was estimated on an underground mining basis. The Exploration Target also captures near-surface mineralisation that may be assessed for open pit development, a pathway not contemplated in the original estimate.

Infrastructure Advantage

On a granted Mining Lease 22km by sealed road from Westgold’s 1.6Mtpa Higginsville CIL processing plant, and within 130km of seven operating processing facilities.

Exploration Strategy

Corazon’s objective at Chalice is to convert conceptual potential into reported Mineral Resources.

The Company is planning at least 7,500 metres of reverse circulation drilling over the next six months. The program will test strike and down-dip extensions of the known mineralisation, infill areas where historical drill spacing is wide, and improve the Company’s understanding of mineralised widths, structural controls and grade continuity. Commencement is subject to funding, access and regulatory approvals.

A detailed review of historical drilling completed in July 2026 had already identified two coherent zones of mineralisation that were not wireframed or included in the Mineral Resource including a near-surface zone sitting against the existing pit design, returning intercepts including 4m @ 8.84 g/t Au from 55m (WMC276) and 3m @ 7.38 g/t Au from 28m (WMC745), and a deeper zone including 3.0m @ 4.03 g/t Au from 514.3m (WMR697). Both informed the Exploration Target.

Oblique view of the Chalice deposit showing planned drill traces

Consolidating the belt

In August 2026 Corazon agreed to acquire 100% of tenement E15/1802 and gold rights over the adjoining tenements E15/1705 and E15/1721 from Dynamic Metals Limited (ASX:DYM), covering 170km² immediately north and south of the Chalice Mining Lease. Mineral Resources Limited (ASX:MIN) confirmed in September 2026 that it will not exercise its rights of first refusal over the gold rights, clearing the path to completion.

The consolidated position gives Corazon more than 40km of strike across the Higginsville greenstone belt. Historical exploration across the acquired ground focused on nickel and lithium, leaving the gold opportunity largely untested. A review of the historical dataset has returned high-grade intercepts including 15m @ 16.19 g/t Au from surface (WMR643), 2m @ 41.31 g/t Au from 134m (WMC363) and 4m @ 9.50 g/t Au from 52m (CHAA0899), within a north-north-west trending mineralised system that remains open along strike and at depth.

The Southern Corridor is Corazon’s immediate priority, where the historical dataset indicates multiple sub-parallel structures. The greenstone belt north of the Chalice mine offers further upside, with host lithologies and interpreted mineralising structures continuing through the corridor.

Map of the 40km Higginsville greenstone belt around the Chalice Gold Mine, showing tenements E15/1802, E15/1705 and E15/1721 and the northern and southern gold targets